Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/aziert83/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/aziert83/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home2/aziert83/public_html/wp-includes/functions.php on line 6114
Let us know what you think! - MovingAhead

Let us know what you think!

Thank you for providing your input! The survey is now closed.

The MovingAhead project team has developed transit options for six corridors in Eugene. The project team has also completed a preliminary evaluation of the corridors.  Your emails, letters, and participation in workshops and the previous online survey informed each of the options in these corridors. Now, the project team needs your input to understand what kind of transit might be right for each corridor. Your input will help the project team in determining which transit options move forward in each corridor. In all corridors, the City and LTD will work together to make improvements for those who bike, walk, use mobility devices, and take transit.  This could include safer or more comfortable bike facilities, sidewalks, bus stops, and crossings.

The project team has also completed a preliminary evaluation of the corridors.

Each corridor has its own page for you to review and provide feedback. You can provide input on any or all of the corridors.

Highway 99River RoadValley River CenterCoburg RoadMLK Jr. Blvd.30th Ave./LCC

A note about the Randy Papé Beltline Highway Corridor: MovingAhead will consider transit service on Randy Papé Beltline Highway to connect new EmX or Enhanced Corridor service on other roadways.  MovingAhead is not considering EmX or Enhanced Corridor improvements on Randy Papé Beltline Highway at this time.