Project Library

Important Project Documents

To open a document, click its title below:

References and Supporting Documents

  1. BRW, Inc. (1995). The Urban Rail Feasibility Study Eugene/Springfield Area Final Report.
  2. Central Lane Metropolitan Planning Organization (MPO). (2017). Regional Transportation Plan (RTP).
  3. CH2M. (2015). Level 1 Screening Evaluation Appendix D: Public Outreach Summary.
  4. CH2M. (2015). Level 1 Screening Evaluation Appendix E: Agency Coordination Summary.
  5. CH2M. (2015). Concept Design Methodology Memorandum.
  6. CH2M. (2015). MovingAhead Public Involvement Plan.
  7. CH2M. (2015). Transit Market Assessment.
  8. CH2M. (2016). Concrete Lane Costs and Risks Memorandum.
  9. CH2M. (2017). Addendum to MovingAhead Alternatives Analysis Technical Reports Memorandum.
  10. CH2M. (2017). Draft Acquisitions and Displacements Technical Report.
  11. CH2M. (2017). Draft Capital Cost Estimating Technical Report.
  12. CH2M. (2017). Draft Community Involvement, and Agency and Tribal Coordination Report.
  13. CH2M. (2017). Draft Community, Neighborhood, and Environmental Justice Technical Report.
  14. CH2M. (2017). Draft Geology and Seismic Technical Report.
  15. CH2M. (2017). Draft Hazardous Materials Technical Report.
  16. CH2M. (2017). Draft Land Use and Prime Farmlands Technical Report.
  17. CH2M. (2017). Draft Parklands, Recreation Areas, and Section 6(f) Technical Report.
  18. CH2M. (2017). Draft Section 4(f) Technical Report.
  19. CH2M. (2017). Draft Street and Landscape Trees Technical Report.
  20. CH2M. (2017). Draft Utilities Technical Report.
  21. CH2M. (2017). Draft Visual and Aesthetic Resources Technical Report.
  22. CH2M. (2017). Draft Water Quality, Floodplain, and Hydrology Technical Report.
  23. CH2M. (2017). MovingAhead Multimodal Transit Corridor Concept Plans.
  24. CH2M, Environmental Science & Assessment, LLC, Heritage Research Associates, Michael Minor & Associates, and Wannamaker Consulting, Inc. (2015). MovingAhead Environmental Disciplines Methods and Data Report.
  25. CH2M, Wannamaker Consulting, Inc., DKS Associates, and John Parker Consulting. (2015). Level 1 Screening Evaluation.
  26. CH2M and Wannamaker Consulting, Inc. (2015). River Road Corridor Terminus Station Options Review.
  27. CH2M and Wannamaker Consulting, Inc. (2016). Pavement Reconstruction as Part of MovingAhead Memorandum.
  28. CH2M, Wannamaker Consulting, Inc., DKS Associates, and John Parker Consulting. (2016). Draft MovingAhead Level 2 Definition of Alternatives.
  29. City of Eugene. (2016). Presence of Bradshaw’s Lomatium (Lomatium bradshawii) at Amazon Park Memorandum.
  30. City of Eugene. (2017). Envision Eugene Comprehensive Plan (Envision Eugene).
  31. City of Eugene. (2017). Eugene 2035 Transportation System Plan (Eugene 2035 TSP).
  32. City of Springfield. (2016). Springfield 2030 Comprehensive Plan.
  33. DKS Associates (DKS). (2015). Transportation Methods and Data Report.
  34. DKS Associates (DKS). (2017). Draft Energy and Sustainability Technical Report.
  35. DKS Associates (DKS). (2018). Draft Transportation Technical Report.\
  36. Environmental Science & Assessment, LLC (ESA). (2017). Draft Ecosystems Technical Report.
  37. Federal Transit Administration (FTA). (2006). Transit Noise and Vibration Impact Assessment.
  38. Federal Transit Administration (FTA). (2016). Reporting Instructions for the Section 5309 Small Starts Criteria.
  39. Heritage Research Associates (HRA). (2017). Draft Cultural Resources Technical Report.
  40. JLA Public Involvement. (2018). MovingAhead Public Involvement & Communications Plan.
  41. John Parker Consulting. (2015). Travel Demand Forecasting Methodology Report.
  42. Lane Council of Governments (LCOG). (1987, as updated in 2015). Metro Plan: Eugene-Springfield Metropolitan Area General Plan (Metro Plan).
  43. Lane Council of Governments (LCOG). (1999). Bus Rapid Transit (BRT) Concept Major Investment Study (MIS) Final Report.
  44. Lane Council of Governments (LCOG). (2001). TransPlan: The Eugene-Springfield Transportation System Plan. (TransPlan).
  45. Lane Council of Governments (LCOG). (2016). LCOG Regional Travel Demand Model.
  46. Lane Transit District (LTD). (2014). Emerald Express System Plan.
  47. Lane Transit District (LTD). (2014). Long-Range Transit Plan.
  48. Lane Transit District (LTD). (2015). MovingAhead Project: Update on Documentation Eliminating Rail-Based Modes Alternatives Memorandum.
  49. Lane Transit District (LTD). (2015). MovingAhead Purpose and Need, Goals and Objectives.
  50. Lane Transit District (LTD). (2016). MovingAhead – Maintenance Facility needs based on MovingAhead (MA) Alternatives Memorandum.
  51. Lane Transit District (LTD). (2017). Draft Operating and Maintenance Costs Technical Report.
  52. Lane Transit District (LTD). (2018). MovingAhead – Additional Data Updated Memorandum.
  53. Lane Transit District (LTD). (2018). MovingAhead – Parks Acquisitions and Displacements Revisions Memorandum.
  54. Lane Transit District (LTD). (2018). MovingAhead – Update to Acres of Acquisition by Land Use Type Memorandum.
  55. Lane Transit District (LTD). (2018). MovingAhead – Update to Employment Data Memorandum.
  56. Lane Transit District (LTD). (2018). Neighborhood Organizations Traversed/Within Corridor Study Areas Data Table Memorandum.
  57. Lane Transit District (LTD) and City of Eugene. (2015). MovingAhead Fatal Flaw Screening Technical Memorandum.
  58. Michael Minor and Associates, Inc. (MMA). (2017). Draft Air Quality Technical Report.
  59. Michael Minor and Associates, Inc. (MMA). (2017). Draft Noise and Vibration Technical Report.
  60. Oregon Department of Transportation (ODOT). (2015). Guidance for Implementation of ORS 366.215.
  61. Oregon Department of Transportation (ODOT). (2016) Analysis Procedures Manual, Version 2, Chapter 14
  62. WSP. (2018). MovingAhead – Community, Neighborhood, and Environmental Justice Tech Report – Census Data Update for Coburg Road Enhanced Corridor and Coburg Road EmX Corridor.
  63. WSP. (2018). MovingAhead – Construction Impacts of New and Removed Pedestrian Bridges Memorandum.
  64. WSP. (2018). MovingAhead – Impacts to Parks of Acquisition Areas and Temporary Construction Easement Areas Memorandum.
  65. WSP. (2018). MovingAhead – Measurements of Exclusive and Priority Lanes Memorandum.
  66. WSP. (2018). MovingAhead – Updated Ridership Data Memorandum.

Public Meeting Archives

May 2019

Sounding Board Meeting #10

April 2019

March 2019

December 2018

Sounding Board Meeting #9

Oversight Committee Meeting #6

August 2018

Sounding Board Meeting #8

July 2018

Oversight Committee Meeting #5

Sounding Board Meeting #7

Other Materials

April 2018

Oversight Committee Meeting #4

Other materials

March 2018

Sounding Board Meeting #6

February 2017

Sounding Board Meeting #5 

November 2016

July 2016

The project team revised the corridor alternatives after the March 2016 open house.

March 2016

These alternatives were reviewed at the March 2016 open house; they have been superseded by the refined corridor alternatives above (May 2016).

Sounding Board Meeting #4

Oversight Committee Meeting #3

October 2015

Other materials

September 2015

Oversight Committee Meeting #2

August 2015

Sounding Board Meeting #3

June 2015

Oversight Committee Meeting #1

Sounding Board Meeting #2

Other materials

May 2015

Community workshops

Sounding Board Meeting #1